The Smarter Foundation for Level 2 Charging

As the demand for electric vehicle (EV) infrastructure rapidly expands, contractors, developers, and municipalities need solutions that are fast, reliable, and scalable. Enter EV Block — a revolutionary precast concrete foundation system designed specifically to simplify and strengthen the deployment of Level 2 EV chargers.

Built for Speed, Strength, and Simplicity

Unlike traditional foundations that require curing time and multiple site visits, EV Blocks arrive at the job site fully cured, pre-engineered, and ready to install. This dramatically reduces installation time, minimizes disruption, and cuts costs — all while ensuring the highest standard of quality.

  • Precast concrete construction ensures strength and consistency.
  • Fast installation in virtually any weather condition.
  • No waiting for concrete to cure, allowing projects to stay on schedule.
  • Compact and transportable: Each unit measures 22” x 22” x 24” and weighs approximately 640 pounds.

Engineered to Perform

EV Block foundations are rigorously tested and built to withstand real-world conditions:

  • Wind-tested for stability up to 175 mph — aligning with modern coastal and hurricane zone design standards.
  • Adapter plate rated for ANSI Tier 15 loading (22,500 lbs) — suitable for passive installations or future upgrades.
  • Universal top plate accommodates nearly all Level 2 chargers, allowing foundations to be installed even before a charger model is selected.
  • ADA slip-resistant surface with load rating compliant for passive installations.

Designed for Versatility and Future-Proofing

EV Block is more than just a foundation — it’s a future-ready platform:

  • Four side conduit openings support installations from any direction.
  • Supports conduit ducting up to 6” in diameter.
  • Acts as a cable pulling access point, simplifying future upgrades or maintenance.
  • Chargers can be added or swapped later without disturbing the base infrastructure.
  • Ideal for phased projects or long-term site planning.